Chinese
   
 
External Business
|Smelting Business

I. Processing Materials Supplied by Clients

1.Smelting and Processing of Gold-Loaded Carbon

Grade of Carbon Tailing≤0.1g/kg carbon(grade of gold-loaded carbon ≤20g/kg)

Integrated Recovery Rate: 99%

Finished Product Quality: Purity ≥99.99%.

Cost of Desorption: 2000yuan/ton dry carbon

Refining Cost: 0.3 yuan/g

Regeneration Cost: acid wash 500 yuan/ton dry carbon, dry method 1500 yuan/ton dry carbon

2.Refining of Crude Gold

Recovery Rate: 99%.

Finished Product Quality: Purity ≥99.99%.

Refining Cost: 0.3 yuan/g


II. Technology and Equipment Transfer

1. The process engineering and equipment for hot pressing cyanide-free desorption~electrowinning of gold-loaded carbon.

Low production cost, the direct cost can be controlled at ≤550yuan/ton dry carbon

High resolution rate, with the grade of carbon tailing ≤0.1g/kg carbon.

Handling of Materials has been mechanized.

2. The process engineering and equipment for combined refining of highly pure gold by chlorination~extraction.

Low production cost, with the direct cost ≤0.1yuan/g.

The chlorination~extraction combined technique has been introduced, resulting in high production efficiency, fine product purity, stable quality and little stockpiling of gold.

Good appearance and quality of the gold bullion

Small area of land occupation and less equipment investment

3. The process engineering and equipment for regeneration of active carbon

by vertical-type constant-current heating.

Low production cost, with the direct cost ≤500 yuan/ton dry carbon.

Less carbon loss and high recovery rate of iodine value, with the recovery rate at ≥90%.

No noise and little soot while the equipment is running, which is environment friendly.

The material turnover has been mechanized.


III. Processing of Gold Bars and Gold Coins

Contact Unit: The Gold Smelting Plant of Zijin Mining Group Co., Ltd.

Contact Person: Liu Yajian

Contact Telephone: 0597-3847866


http://www.zjky.cn/
All Rights Reserved
闽ICP备05011169号